First check stationary concrete batching plant is perfect for all the security tools, and then clean up the construction site, leaving enough space. Then clean up batching machine,stationary concrete batching plant cement residue positions within the attention off water, gas, electricity and other ancillary facilities to clean up and remove the electrical, water and admixtures, compressed air lines. Then began to gradually dismantle mixing station, follow these steps:
1, removal of layers of ingredients, mixing layer peripheral boards.
2, removal of feed layer roof, roof trusses and so the overall structure.
3, removal of the head of the screw conveyor and belt conveyor belt conveyor mechanical parts and trusses stationary concrete batching plant (demolition should be preceded by the above rollers and other mechanical parts removed).
4, removal of all mechanical equipment and ingredients layer ingredients podium.
5, removal of the bay, control room and control room bracket.
6, removal of the hopper and mixer and mixing layer corresponding platform stairs.
7, removal stir staircase layers below the platform and the platform, columns and so on.
8, Lever demolition aggregate positions and less machinery and equipment.
9, removal powder cans and above all the facilities, and then remove the powder cans bent below.
10, to clean up after all the parts in inventory of what these devices to ensure the integrity and intact equipment.