stationary batch plant how maintenance and repair methods

Cleaning stationary batch plant and material inlet and outlet
Since the stationary batch plant for a short time solidified into lumps, and steel and paint a certain corrosive,stationary concrete batching plant so the concrete tank after each use, wash adheres to the concrete tank and concrete is expected out daily maintenance work must be carried out carefully. Including: a front loading washing with water every time the inlet, so that the inlet kept moist during loading;.
. b in charge while the vehicle comes with cleaning water tank filled with water;
. c After loading washing feed, wash the residue in the vicinity of the inlet of concrete;
. d to the site after unloading, wash out the trough, and then added to the concrete tank cleaning water 30-40L;Stabilized Soil Mixing Plant keep the concrete mixing concrete tank tanker slowly rotate forward when the vehicle return;
. e remember to let go before the next loading of concrete sewage tank inside;
f. thoroughly cleaned every day when you knock out the surrounding concrete tanks and discharge port, ensure sticky cement and concrete lumps.
These work as long as one does not seriously, it will bring a lot of trouble for the future work.