Stationary concrete batching plant difference

Stationary concrete batching plant in use, require concrete foundations, then the device is fixed on it. stationary concrete batching plant Its production capacity is still pricey.
Mobile concrete mixer with traction tires can walk, convenient and flexible transitions, but lower production capacity. All action process, operation, maintenance and fixed it exactly automatic mixing station; along with mobile and flexible, quick and easy disassembly, easy storage management and other unique features; are public railways, bridges, ports, utilities, etc. construction works best mobile GRF models.Stationary concrete batching plant stirred sufficiently concrete workability, high mixing efficiency.Stationary concrete batching plant in use,Stationary concrete batching plant require concrete foundations, then the device is fixed on it. Its production capacity is still pricey.Stationary concrete batching plant control system is simple, convenient, can be achieved manually controlled machine automatic control.

2014年7月22日星期二

stationary concrete batching plant migration matters

First check stationary concrete batching plant is perfect for all the security tools, and then clean up the construction site, leaving enough space. Then clean up batching machine,stationary concrete batching plant cement residue positions within the attention off water, gas, electricity and other ancillary facilities to clean up and remove the electrical, water and admixtures, compressed air lines. Then began to gradually dismantle mixing station, follow these steps:
1, removal of layers of ingredients, mixing layer peripheral boards.
2, removal of feed layer roof, roof trusses and so the overall structure.
3, removal of the head of the screw conveyor and belt conveyor belt conveyor mechanical parts and trusses stationary concrete batching plant (demolition should be preceded by the above rollers and other mechanical parts removed).
4, removal of all mechanical equipment and ingredients layer ingredients podium.
5, removal of the bay, control room and control room bracket.
6, removal of the hopper and mixer and mixing layer corresponding platform stairs.
7, removal stir staircase layers below the platform and the platform, columns and so on.
8, Lever demolition aggregate positions and less machinery and equipment.
9, removal powder cans and above all the facilities, and then remove the powder cans bent below.
10, to clean up after all the parts in inventory of what these devices to ensure the integrity and intact equipment.

2014年7月17日星期四

classification and presentation capabilities concrete mixer

Works with different concrete mixer and civilian type concrete mixer is: engineering are subject to compulsory concrete mixer concrete mixer, such as mandatory upgrade series concrete mixer,Stationary concrete batching plant twin-shaft compulsory concrete mixer;
     Civilian-type concrete mixer drum belong concrete mixer, such as: friction drum concrete mixer, concrete mixer drum climb bucket.
     Works with different characteristics concrete mixer: concrete mixer is part of twin-shaft compulsory concrete mixer; concrete mixer belonging to a single horizontal shaft forced type concrete mixer. Different characteristics of civil concrete mixer: Series of friction is the use of concrete mixer drum lift the material, belongs to enhance concrete mixer drum;batching plant manufacturers climb bucket concrete mixer drum is the use of climbing bucket loading and different feeding methods.
     Therefore, different models with special concrete mixer is not the same, the reason that is not the same, because although concrete mixer different but also have in common, just as friction drum and climbing bucket concrete mixer concrete mixer drum same.

2014年7月10日星期四

stationary batch plant how maintenance and repair methods

Cleaning stationary batch plant and material inlet and outlet
Since the stationary batch plant for a short time solidified into lumps, and steel and paint a certain corrosive,stationary concrete batching plant so the concrete tank after each use, wash adheres to the concrete tank and concrete is expected out daily maintenance work must be carried out carefully. Including: a front loading washing with water every time the inlet, so that the inlet kept moist during loading;.
. b in charge while the vehicle comes with cleaning water tank filled with water;
. c After loading washing feed, wash the residue in the vicinity of the inlet of concrete;
. d to the site after unloading, wash out the trough, and then added to the concrete tank cleaning water 30-40L;Stabilized Soil Mixing Plant keep the concrete mixing concrete tank tanker slowly rotate forward when the vehicle return;
. e remember to let go before the next loading of concrete sewage tank inside;
f. thoroughly cleaned every day when you knock out the surrounding concrete tanks and discharge port, ensure sticky cement and concrete lumps.
These work as long as one does not seriously, it will bring a lot of trouble for the future work.

2014年7月3日星期四

Stationary mixing plants

Stationary concrete mixing station is mainly used for the project, the main purpose of mixing concrete, also called concrete mixing station. HZS series concrete mixing station goods internationally popular fast assembly modular structure, high import mixer, dual dual-control computer control, noise, dust, pollution prevention, environmental design, is a new generation of concrete mixing equipment, ready-mixed concrete products for the city, bridge, water conservancy, airports, ports and other large infrastructure projects and concrete demand for places.
Classification
Mixing station there can be divided into single station and double station, as the name implies,every single station that has a mixing console mixing station, two stations have two mixing console,mixing console each corresponds to a discharge port, so the dual stir stand alone mixing concrete mixing equipmentstation is 2 times the production capacity,dual mixing station naming is 2HZS **, such 2HZS25 refers to mixing capacity of 2 * 25 = 50 m3 / h dual mixing station.
During installation, the body is prohibited tilt positions, leg deformation.
2, the bottom of the legs and welded firmly embedded base.
3, good wind, lightning work.
4, is strictly prohibited and legs strong impact body positions.
5, regular inspection of cement dust bag attached to the case, timely cleanup.
6, the foundation must be strong,in line with the architectural design specification.
7, once the bag blocked,concrete plant the pressure inside the warehouse warehouse roof over safety pressure relief valve pressure, truck  pressure relief valve to open positions within the release pressure and prevent warehouse explosion accidents.
8, when the cement silo (cement tank) work must be performed by a dedicated crane to erect, and then into pre prefabricated concrete foundation, and check the cement silo (cement tank) erected after the vertical and the horizontal degree and then at the bottom and welded firmly embedded base.