Should be cleaned of concrete mixer note the following:
First,Stabilized Soil Mixing Plant regular maintenance procedures specified in the project, maintenance operations, such as cleaning, lubrication, fuel, etc.
Second, concrete mixer first check before starting the controllers is good, after stoppage of water and stones into the mixing tube 10 to 15 minutes to clean, then water and out. Operator into the mixing tube cleaning as required, in addition to cut off the power and remove the fuse outside, and shall lock switch box.
Third, concrete mixer beat prohibit the use of a sledgehammer approach to clear accumulated in the concrete mixer concrete cylinder can only be removed with a chisel.
Fourth, in the cold season, after the work is completed and the application of water to clean the mixer drum pumps,Stabilization Plant water tanks, put the net in the water pipes, in order to avoid water pumps, water tanks, pipes and other frozen.